News

Dai Hung Oil Rigs

Dai Hung Petroleum Operating Company Limited under Petrovietnam Exploration Production Corporation (PVEP POV) has successfully begun operation of the modern Dai Hung oil rig 02 (DH-02), which was domestically designed and manufactured, at Dai Hung (Big Bear) oil field. This again shows that the engineers of the oil and gas industry of Vietnam are capable of mastering the technology of building and installing oil rigs in the deep sea.

After a flight of more than one hour by the helicopter Super Puma VN8610 which departed from Vung Tau, we arrived at drilling rig DH-02 in the center of the Dai Hung oil field in Nam Con Son basin, 265km southeast of Vung Tau.

Seen from above, the rig looked huge and imposing in the dark blue water of the ocean. The rig, owned by PVEP POC, is particularly important because it is a specialized platform operating in deep water of over 110m. It is the largest and heaviest rig with a base weighing 4,900 tonnes fixed in the seabed. It is 125m high and has a superstructure weighing 1,100 tonnes.

DH-02 is the first rig manufactured in Vietnam and was built, installed and operated by local contractors. On August 11, 2011, after two years of implementing the project to develop Dai Hung oil field and more than two months of construction and installation, the first oil flow from the DH-12P well of DH-02 came out with a capacity of 6,400 barrels/day, 50 days earlier than the Government’s plan. As estimated, after completion, DH-02 with five wells will increase the oil output at Dai Hung oil field from 4,000 barrels/day to 18,000 barrels/day.

Previously, PVEP POC successfully operated the floating rig DH-01 at Dai Hung oil field after it renovated and upgraded the equipment. DH-01 was an old rig that was designed and put into operation in 1974.

Read more…

Leave a Reply

Your email address will not be published. Required fields are marked *

Fill out this field
Fill out this field
Please enter a valid email address.
You need to agree with the terms to proceed